Showing posts with label fuel pump. Show all posts
Showing posts with label fuel pump. Show all posts

Sunday, November 4, 2012

Fuel tank to fuel filter to fuel pump


<< Install Cross Over Tube                     Tunnel Floor and Venting >>

Major System Category: Fuel System
Task: Install fuel filters and fuel pump
Parts: Fuel pump and plumbing
Prerequisite Tasks: Aluminum Tanks
Additional Costs: $930 (entire fuel pump and fittings)
Time Requirement: 3 hours (plus some staring at stuff time)
Date Started: November 3, 2012
Date Completed: November 3, 2012
The is the box of parts from QRP. There are instructions included for how to wire up the fuel bump and filters and regulator. It is up to the builder to figure out the best way to plumb the fuel lines. Once you sit down and think it, this isn't that hard to do.
Note: This post does not reflect the Factory Five build manual. I am using QRP's aluminum tanks and external fuel system. This is a personal choice that reflects my belief that this is a better way to go.
Holley fuel pump with the anti vibration mounts attached.
To say that the box of parts for the fuel system is a little intimidating is something of an understatement. The first thing I did was separate everything into their like parts. There 6 AN and 8 AN fittings. There is steel braided hose for 16 AN, 8AN and 6 AN. There are elbows, straight couplers, hose fittings, a pre and post fuel filter, pressure regulator, gauge and the fuel pump.
This is the supply line from the driver's side fuel tank to the fuel system. This is a 8AN fitting.
Consideration: This is definitely a task that should be done BEFORE  the engine is put into the car. You can stand in the engine bay and work on this stuff. Also connect the cross over tube FIRST. This sets the tanks in place.

Fundamentally, this is what has to happen:
  1. Run a 8 AN line from the driver's side fuel tank to a pre fuel filter. This is the small one.
  2. Connect the pre fuel filter to the fuel pump using 8AN fittings.
  3. Connect the fuel pump to the the post fuel filter using 8 AN fittings. This is where I used the nifty 160 degree elbow fitting to navigate the sharp angle above the fuel tank housing.
  4. Exit the post fuel filter with a 6 AN fitting. Since everything else is a 6 AN fitting in the kit, I am guessing the connection to the fuel rails are 6 AN.
Supply line from the fuel pump connected to the pre fuel filter. This is going to be  routed into the fuel pump, but I need a 8AN/8AN straight coupler to make that happen.

Fuel pump and post fuel filter mounted and the panel above the fuel tank on driver's side.  
This required me to make the following lines:
  1. 8AN line from the fuel tank to the pre fuel filter. This approximately 16 inches long.
  2. 8AN line from the 160 elbow to the post fuel filter. This about 6 inches long.
This is the supply line from the fuel tank to the pre fuel filter.

This is the supply line from the fuel pimp to the fuel filter. See the nifty 160 degree elbow.
I have a video on how to build the AN lines on my cross over tank post.

Consideration: When measuring steel lines, the tape measure is great for an initial idea. However, I found that the steel lines do not bend sharply, so it was best to run the line along the same route and mark the line where it comfortable terminates.

Thursday, November 1, 2012

Fuel Tank Crossover Tube


<< Install Fuel Tanks                      Driver's Side fuel pump >>

Major System Category: Fuel System
Task: Install Cross Over Tube
Parts: Fuel pump and plumbing
Prerequisite Tasks: Aluminum Tanks
Additional Costs: $930 (entire fuel pump and fittings)
Time Requirement: 90 minute
Date Started: November 1, 2012
Date Completed: November 1, 2012
I received the QRP fuel pump system the week before we went to San Diego. So it has been sitting in my office for about two weeks. This is a box full of fittings, braided hoses, a relay, pressure gauge, fuel filters, anti vibration mounts and the Holley fuel pump. At first blush, this is a head scratcher.
This is the box of goodies QRP supplies for the fuel pump side of the  fuel system.

The first thing I needed to figure out was how to attach a AN fitting to a braided steel hose. A quick Google search found a great little YouTube video that even a computer geek can follow. I knew I was in the right place, because it featured a big hammer.

The easiest thing to do in the fuel system is to run the cross over tube between the two tanks. This is a really big steel braided hose with AN 16 fittings on each end. It is better to start out with a finished piece that is too long instead of too short. The secret to making this work is tilting one of the tanks so the tank's AN fitting is outside of the cut out in the tunnel. This enables the cross over tube to fit between the tanks. As you screw things in, everything comes back into place.
This is the piece as delivered by QRP. These guys are very generous. They provide enough hose to make 2 crossover tubes (just in case you screw it up the first time.) 

This is my finished hose. 

I had to go back twice to trim an inch off the tube. I wanted to make sure there was some slack in the line, but this is a relative concept. If there is too much slack it is not possible to connect the tanks, and it there is no slack, you have to start over.
Installed inside the tunnel between the two fuel tanks. This is about 12 inches further into the tunnel than when the Corvette donor tanks are used. This means it is further away from the heat and moving parts.

Saturday, October 6, 2012

Aluminum Tanks

<< Rear Quarter Floor (R, L)             Fuel Tank Crossover Tube >>

Major System Category: Fuel System
Task: Install Aluminum Tanks
Parts: Aluminum Tanks
Prerequisite Tasks: Rear Tunnel Aluminum
Additional Costs: $1200
Time Requirement: 3 hours
Date Started: October 6, 2012
Date Completed: October 6, 2012
Sometime in mid-August, I started working on the Corvette tank modifications. The further I progressed on this task, the more obvious it became that there was no way this was a good idea. First The driver's side tank becomes the passenger, then the manual instructs that holes be drilling into the bottom of both tanks. The specified hole turns out to be larger than the supplied AN fittings. Plus, I realized I had just created the weak link in a fuel system running at 50 PSI.
Quick Racing Products aluminum tanks.
I test mounted the Corvette tanks, raised the lift and read further in the build manual. Based on my understanding, the plan was to run a fuel line between the tanks right in front of the engine. Indeed, this is something that needs to happen, but seemed really close to where the accessories are going to be spinning. I stood there under the car looking from the manual to the car, and slowly it began to penetrate my rather thick skull, why one poster on the FF forums said the Quick Racing Products tanks are a must have.
Black silicone applied to the 2x4 blocks.
There are enough threads from people who have had fuel tank leak issues. Remember, my chassis is number 402. According to the Stewart Transport driver, he is delivering approximately 10 GTMs per year. Only half of these (Gen I and II) are complete. So if a significant number in that population write about fuel leak or heat problems, I need to listen. To balance this, there are GTM owners that have followed the build manual recommendations and do not have leaks. Then there was the guy who went that route, and after some 5 or 6k miles, his tanks started leaking. He has had to tear half the car apart to fix this problem (not a happy camper).
Camper mount tape applied to the chassis members that contact the fuel tanks.  The wood blocks also have tape applied and sit inside the rear quarter pan behind the fire wall. Orientation: Looking towards the rear of the vehicle where the fuel tanks reside from the driver's cockpit.
So I sat down with the budget spreadsheet. Aluminum tanks and the corresponding fuel pumps were not in the budget. I pushed back the ISIS power purchase (maybe into 2013), bit the bullet and ordered the tanks and fuel pumps and all the plumbing needed to make it work. I decided the a fuel leak in an area where fumes can accumulate next to a hot engine in a high performance sports car is not a good thing. Yes, I am spending a lot of time building this car (and having a blast doing it), but I also want to spend some time driving her when she's finished.
This is the cut out in the tunnel wall. I took the measurements from the template and ran lines. Then I test mounted the  fuel tanks, and figured where I needed a tad more room. Finally, I sanded and deburred the openings. Orientation: Facing rear tunnel from driver's cockpit.

Ron and Ted are the two guys on the other end of the phone when you talk or write to Quick Racing Products. I've never put a fuel system in before. Both of them were willing to take the time to answer my questions. They also knew what I needed when I gave them the engine specs. While this isn't a turn key, drop in solution, I feel better about not drilling holes into perfectly good fuel tanks.
Fuel tanks installed. The driver's side tank is closest. It is a bit harder to make out  the passenger side  tank. I applied camper mount tape to the back of the tank as well. This is where the fire wall makes contact with the fuel tanks.
The installation process is straight forward.
  1. Install the floor plates (thank goodness for lift!)
  2. Cut 4 1 foot sections of 2 x 4. (My buddy Vern cut me a 2 x 4 a couple of weeks ago, who knew that half of it would end up inside the car!)    
  3. Apply black silicon to the underside of the wood. The tanks sit on top of the wood.
  4. Apply camper mount tape to the contact points (on the chassis) where the tanks make contact.
  5. Cut out a section (per the supplied template) in the tunnel wall. (This part of the tunnel was already installed. Be careful not to cut through a brake or clutch line.)
This is the passenger side tank fitting for the cross over pipe that runs between tanks. This is a good 12 inches further back into the tunnel and away from the engine.

I test mounted the new tanks a couple times. Everything seems to fit okay. I'm just waiting on the fuel pump and related supplies to show up next.
Search Engine Submission - AddMe